Lowbridge PD2 1349 continues to make progress. Most of its window pans were severely corroded so new ones are being made and should be available to fit in the next month or so. A significant number of the external panels on the nearside are now in place and work has started on the support structure for the lower deck floor. All the ceiling panels are fitted upstairs and a start has been made on fitting them in the lower saloon.

Lower deck ceiling panels are being fitted

Nearside panels are being fitted