Work has continued on our two PD2 projects. Lowbridge 1349 has received a new upright pillar at the front of the offside which provides much needed structural strength. Now that is in place it has been possible to start putting in place new pillars and panels on the offside at the photo illustrates.

Work on highbridge 1467 is currently focussed on the platform and stairs. A new platform base has been shaped and fitted while the stairs have been sanded down to remove all paint and rust. They will shortly be primed and then painted before being refitted to the bus. Not only will this be a useful move forward but it will remove an unwieldy item from our workshop floor.